A Balanced Vision Plan for the Trinity River Corridor

Balanced Vision Plan Graphic (Adobe PDF of above image, 19.6 MB)
Cover (1.2 MB)
Prepared For (5.1 MB)
Table of Contents (9.4 MB)
Quote from Mayor Laura Miller (1.4 MB)
Executive Summary (9.4 MB)
Introduction (4.6 MB)
The Vision - Overview (Pages 5 to 16)
Page 5 (10.4 MB)
Page 6 (4.0 MB)
Page 7 (4.3 MB)
Page 8 (6.4 MB)
Page 9 (3.1 MB)
Page 10 (3.5 MB)
Page 11 (2.3 MB)
Page 12 (3.1MB)
Page 13 (3.8 MB)
Page 14 (5.3 MB)
Page 15 (3.4 MB)
Page 16 (2.1 MB)
- Flood Protection (15.6 MB)
- Environmental Restoration and Management (16.9 MB)
- Parks and Recreation (18.5 MB)
- Transportation (19.4 MB)
Transportation initiatives related to the Trinity River Corridor Project include the following: Trinity Parkway, S .M . Wright Freeway Improvements, Sylvan Avenue Bridge, Industrial Boulevard (name change to Riverfront Boulevard in late 2009), Beckley Avenue Improvements, other pedestrian oriented improvements related to trails and bike paths.
Note: The Oak Cliff levee top road, as described in the originally approved Balanced Vision Plan from 2003, will not be constructed due to concerns from the U .S . Army Corps of Engineers. The Balanced Vision Plan document shown on the Trinity River Corridor Project web site is presented in its original format without alteration.
- Community and Economic Development (18.6 MB)
Implementing the Vision
Overview (2.0 MB)
- Costs, Phasing and Funding (2.6 MB)
- Project Schedule (1.8 MB)
- Operations and Maintenance (3.3 MB)
- Recommendations (207 KB)
Long-term Strategy (204 KB)
Appendix A - Public Involvement, Input, and Background Information for the Study (23 KB)
Appendix B - Capital Cost Estimate (450 KB)
Folded Insert Maps
Flood Protection (6.4 MB)
Environmental Restoration and Management (6.4 MB)
Parks and Recreation (6.1 MB)
Transportation (6.4 MB)
Community and Economic Development (6.6 MB)
Other Links:
Refinement of the Balanced Vision Plan
(March 22, 2004) another briefing that focused on lake configuration changes to better accommodate the I-30 Signature Bridge initiative and reverse lake flow for the Urban Lake and the Natural Lake. (1.7 MB)
Refinement of the Balanced Vision Plan
(March 1, 2004) presented to the Trinity River Committee that focused on more river channel meanders and less wetlands. (2.8 MB)
Possible Funding Scenario
for the Expanded Basic Program presented to the Dallas City Council on December 3rd, 2003.
Reunion Overlook Study
Conceptual sketches of the pedestrian crossong at Reunion Blvd. (18.3 MB)
Trinity White Water Master Plan
Conceptual plans of a standing wave and a full whitewater course. (5.2 MB)