​​

Jefferson Bridge

In the planning stage, TxDOT is considering the replacement of the Jefferson Street Bridge with a six lane two way bridge. It this new bridge is built, it will provide a direct connection to IH-35E. The existing bridge and traffic interchange at Zang Boulevard would will be demolished within the realignment plans. This design is in a schematic phase at this time. No schedules or funding is currently identified.​​​​​

Upcoming Events
Jun 23 2019 12:00 AM

"Mary Poppins Returns" showing on 6/21 at Pavilion & Amphitheater at Moore Park and on 6/22 on the Ronald Kirk Bridge and Felix H. Lozada Sr., Gateway  

English Flyer           Spanish Flyer





Jun 28 2019 12:00 AM

Summer Camp Field Day on Thursday, June 27, 2019.  

Event Flyer             Spanish Event Flyer