Jefferson Bridge

In the planning stage, TxDOT is considering the replacement of the Jefferson Street Bridge with a six lane two way bridge. It this new bridge is built, it will provide a direct connection to IH-35E. The existing bridge and traffic interchange at Zang Boulevard would will be demolished within the realignment plans. This design is in a schematic phase at this time. No schedules or funding is currently identified.

Upcoming Events
Jun
13
2013
5:00 p.m. - 7:00 p.m.
1837 E. 8th Street
Jun
20
2013
Trinity River Audubon Center
9:00 a.m. - 9:00 p.m.